← back to audit · 01KQQNBCXMJBEC32BYJB1SCHS9

Teresa Ramirez

Teresa Ramirez
Asana ↗ v1 awaiting_review stage=awaiting_review iters=0 conf=82%
Download JSON

Patches (downloadable JSON)

No patches recorded yet. Run hasn't reached the iteration loop.

Iteration history (0)

No iterations recorded (run hasn't reached the loop, or this is a v1 run).

Audit log (16 events)

# Level Stage Message Time
331 info asana_fetched Resolving Asana task reference 'https://app.asana.com/1/1203754389657527/project/1211039529104749/task/1211709017140700' 2026-05-03T19:34:24
332 info asana_fetched Loaded Asana task: Teresa Ramirez
payload
{
  "customer": "Teresa Ramirez",
  "gid": "1211709017140700",
  "title": "Teresa Ramirez"
}
2026-05-03T19:34:25
333 info drive_resolved Searching Asana fields for Google Drive URL 2026-05-03T19:34:25
334 info drive_resolved Resolved Drive folder (8 items, 7 in CAD/)
payload
{
  "cad_folder_id": "1QSubAYKQtku-FjHGZL0Y7rTqCilfizul",
  "folder_id": "1lcO5aA-VkQ3sJlAZh7r_jXH5laQHAcX_"
}
2026-05-03T19:34:26
335 info pdf_downloaded Picking the latest-dated plan-set PDF 2026-05-03T19:34:26
336 info pdf_downloaded Downloaded plan-set: Teresa Ramirez_V0_12-16-2025.pdf (8.2 MB)
payload
{
  "bytes": 8555492,
  "filename": "Teresa Ramirez_V0_12-16-2025.pdf"
}
2026-05-03T19:34:29
337 info bom_downloaded Looking for the BOM CSV in the same folder 2026-05-03T19:34:29
338 warn bom_downloaded No BOM CSV in folder — modules section will rely on PDF + Asana only 2026-05-03T19:34:29
339 info ai_extracted Extracting text from the plan-set PDF 2026-05-03T19:34:29
340 info ai_extracted Pass 1/3: Claude Opus 4.7 (full extraction) 2026-05-03T19:34:36
341 info ai_extracted Pass 1: Opus filled 65 fields (avg 85%) 2026-05-03T19:35:43
342 info ai_extracted Pass 2/3: Claude Sonnet 4.6 retrying 32 missing fields 2026-05-03T19:35:43
353 info ai_extracted Pass 2: Sonnet added 25 more fields 2026-05-03T19:36:57
354 info ai_extracted Pass 3/3: Claude Opus 4.7 final retry on 7 stubborn fields 2026-05-03T19:36:57
355 info ai_extracted Extracted 90 fields, avg confidence 82% (Opus: 65, Sonnet retry: +25, 7 still unfilled)
payload
{
  "avg_confidence": 0.823,
  "extra_fields": 0,
  "fields": 90,
  "missing": 7,
  "passes": {
    "opus_full": 65,
    "opus_retry": 0,
    "sonnet_retry": 25
  },
  "usage": {
    "cache_creation_input_tokens": 9992,
    "cache_read_input_tokens": 0,
    "input_tokens": 77980,
    "output_tokens": 9409
  }
}
2026-05-03T19:37:04
356 info awaiting_review Pipeline complete — review the extracted fields and submit when ready 2026-05-03T19:37:04

Field values (90)

Show all extracted + edited fields
Key AI value User value Conf Edited In map
Attachment points staggered Yes 0.50 no yes
Backup contains service disconnect Yes 0.80 no yes
Backup device manufacturer Tesla 0.95 no yes
Backup device model Backup Switch 0.95 no yes
Backup device OCPD rating (Amps) 200 0.70 no yes
Backup feeder conductor material Copper 0.90 no yes
Busbar #1 already present on site Yes 0.90 no yes
Busbar #1 interconnection compliance method 120% rule 0.90 no yes
Busbar #1 main-lug-only solo main breaker present No 0.70 no yes
Busbar #1 main panel upgrade No 0.95 no yes
Busbar #1 number of branch circuit breakers 2 0.60 no yes
Busbar #1 on line side of main service panel No 0.85 no yes
Busbar #1 panel type Main Service Panel 0.85 no yes
Busbar #1 rating (Amps) 200 0.95 no yes
Busbar #1 subject to backfeed Yes 0.85 no yes
Busbar feeder interconnection compliance method 705.12(B)(2) 0.85 no yes
Busbar feeder max THWN-2 conductors in raceway 3 0.90 no yes
Busbar feeder OCPD rating (Amps) 70 0.85 no yes
Busbar feeder wire gauge (AWG) 4 0.90 no yes
Calculated backup load (Watts) 11500 0.55 no yes
Combiner panel contains ESS No 0.75 no yes
Combiner panel has dedicated OCPD Yes 0.90 no yes
Combiner panel interconnection location New Subpanel 0.85 no yes
Current roof covering material Asphalt or composition shingles 0.95 no yes
ESS assembly weight (lbs) 291 0.90 no yes
ESS subject to vehicle damage (alternate) No 0.75 no yes
ESS unit charging from grid Yes 0.60 no yes
ESS unit has dedicated OCPD Yes 0.80 no yes
ESS unit installation location (architecture: Energy Storage System) Outdoor walls 0.85 no yes
ESS unit interconnection location New Subpanel 0.75 no yes
ESS unit is single unit with inverter Yes 0.90 no yes
ESS unit manufacturer (architecture: Energy Storage System) Tesla 0.97 no yes
ESS unit model (architecture: Energy Storage System) Powerwall 3 (1707000-11-J-DOM) 0.92 no yes
ESS unit OCPD rating (Amps) 60 0.90 no yes
ESS unit quantity (architecture: Energy Storage System) 1 0.97 no yes
ESS units have separation less than 3 feet (alternate) No 0.85 no yes
Flush mount or tilt-up Flush mount 0.92 no yes
Home has sprinkler systems No 0.45 no yes
Homeowner Full Name Teresa Ramirez 0.98 no yes
Inverter 1 interconnection location New Subpanel 0.85 no yes
Inverter 1 Manufacturer Tesla 0.97 no yes
Inverter 1 Model Number 1707000-11-J-DOM 0.95 no yes
Inverter 1 OCPD rating (Amps) 60 0.95 no yes
Inverter architecture type String Inverter without DC-DC Converters 0.60 no yes
Inverter output uses NM cable No 0.85 no yes
Main breaker derate applied No 0.75 no yes
Max DC PV Wire / USE-2 conductors in raceway (excl. EGC) 4 0.85 no yes
Max DC THWN-2 conductors in raceway (excl. EGC) 4 0.80 no yes
Maximum distance from module to roof (inches) 7 0.60 no yes
Maximum input DC open circuit voltage (Voc) of PV inverter 600 0.90 no yes
Maximum input DC short circuit current (Isc) of PV inverter 19 0.90 no yes
Maximum number of modules in a DC series string 7 0.85 no yes
Maximum OCPD rating allowed on Inverter 1 (Amps) 60 0.90 no yes
Maximum spacing between adjacent attachment points (inches) 48 0.90 no yes
Max microinverters per branch circuit 7 0.55 no yes
Microinverter module capacity (W) 450 0.70 no yes
Microinverters protected by 20A OCPD Yes 0.60 no yes
Microinverter total quantity 18 0.90 no yes
Module 1 Quantity 13 0.98 no yes
Module fire rating type 2 0.40 no yes
Module is bifacial No 0.85 no yes
Module Manufacturer Q CELLS 0.95 no yes
Module Model Number Q.PEAK DUO BLK ML-G10.C+ 410 0.95 no yes
Number of composite shingle layers 1 0.60 no yes
OCPD protecting busbar #1 rating (Amps) 70 0.95 no yes
Project Address 248 Mount Arbor Street, McFarland, CA 93250 0.95 no yes
Project valuation (USD) 43296 0.85 no yes
PV system weight (lbs/sq ft) 4.0 0.45 no yes
Racking System Manufacturer Unirac 0.97 no yes
Racking System Model Number NXT UMOUNT 0.95 no yes
Rafter has ceiling joists No 0.65 no yes
Rafter largest span (feet) 24.0 0.35 no yes
Rafter size (nominal) 2x4 0.92 no yes
Rafter spacing (inches) 24 0.95 no yes
Rafter type Engineered truss 0.90 no yes
Rapid Shutdown compliance method inside array PV Hazard Control System (UL 3741) 0.70 no yes
Rapid Shutdown Device Manufacturer Tesla 0.97 no yes
Rapid Shutdown Device Model Number MCI-2S 0.95 no yes
Rapid Shutdown Device Quantity 5 0.97 no yes
Roof framing type Truss 0.90 no yes
Roof has flat plane No 0.60 no yes
Roof penetration sealant method name and description Unirac Stronghold Butyl attachment with pre-applied butyl pad 0.90 no yes
Roof pitch 4/12 0.70 no yes
Storage architecture Energy Storage System 0.90 no yes
Supply side connection per NEC 705.12(A) No 0.85 no yes
Total roof area (sq ft) 1884 0.85 no yes
Utility available fault current greater than 10 kA at service No 0.60 no yes
Utility company name Southern California Edison 0.90 no yes
Utility service feed rating (Amps) 200 0.95 no yes
Whole home backup Yes 0.95 no yes

Artifacts (3)

Kind Path Size SHA
asana_json /data/runs/01KQQNBCXMJBEC32BYJB1SCHS9/asana.json 39325 B
pdf /data/runs/01KQQNBCXMJBEC32BYJB1SCHS9/pdf/Teresa_Ramirez_V0_12-16-2025.pdf 8555492 B 41acb4f7fafc1047
extraction /data/runs/01KQQNBCXMJBEC32BYJB1SCHS9/extraction.json 39964 B